Industry |
Name of Project |
Date |
Country |
Capacity (m³/day) |
Process |
Work Scope |
Oil&Gas/Chemistry |
Eni Zubair DGS North Package Water Treatment System |
2014 |
Iraq |
Raw Water : 9,360/Demi. : 120 |
UF+SWRO+BWRO |
EP |
Oil&Gas/Chemistry |
West Qurna Field 2nd Project/Iraq(RWT) |
2014 |
iraq |
13,776 |
Clarifier+MMF+UF+RO |
EP/SV |
Oil&Gas/Chemistry |
West Qurna Field 2nd Project/Iraq(WWT) |
2014 |
iraq |
65 |
MBR |
EP/SV |
Oil&Gas/Chemistry |
West Qurna Field 2nd Project/Iraq(Produced Water) |
2014 |
iraq |
10,560 |
CPI+IGF+NUTSHELL FILTER |
EP/SV |
Oil&Gas/Chemistry |
West Qurna Field 2nd Project/Iraq |
2014 |
iraq |
31,680 |
ACF |
EP/SV |
Power |
Zwitina CCP, Demineralization System (Libya) |
2013 |
Libya |
1,440 |
Ion Exchange |
EP/SV |
Power |
Zwitina CCP, Wastewater Treatment System (Libya) |
2013 |
Libya |
1,200 |
Physical-Chemical |
EP/SV |
Power |
Petron3-4, Pretreatment System + Demineralization System |
2012 |
Philippines |
Pretreat : 20,400 / Demi : 10,800 |
RO + MBP |
EPC |
Power |
Petron3-4, Wastewater Treatment System |
2012 |
Philippines |
3,840 |
Physical-Chemical |
EPC |
Oil&Gas/Chemistry |
Skikda Refinery Project ETP |
2012 |
Algeria |
10,800 |
Physical/Chemical / /MBBR |
EP/SV |