| Industry |
Name of Project |
Date |
Country |
Capacity (m³/day) |
Process |
Work Scope |
| Power |
Zwitina CCP, Demineralization System (Libya) |
2013 |
Libya |
1,440 |
Ion Exchange |
EP/SV |
| Power |
Zwitina CCP, Wastewater Treatment System (Libya) |
2013 |
Libya |
1,200 |
Physical-Chemical |
EP/SV |
| Power |
Petron3-4, Pretreatment System + Demineralization System |
2012 |
Philippines |
Pretreat : 20,400 / Demi : 10,800 |
RO + MBP |
EPC |
| Power |
Petron3-4, Wastewater Treatment System |
2012 |
Philippines |
3,840 |
Physical-Chemical |
EPC |
| Oil&Gas/Chemistry |
Skikda Refinery Project ETP |
2012 |
Algeria |
10,800 |
Physical/Chemical / /MBBR |
EP/SV |
| Oil&Gas/Chemistry |
Skikda Refinery Project ETP |
2012 |
Algeria |
14,592 |
2B3T + MBP |
EP/SV |
| Iron/Steel |
Brazil CSP Steel Plant_Raw water treatment facilities |
2012 |
Brazil |
74,000 |
Grit chamber+Mixing/Floc./Sedi.+Sand filter |
EP/SV |
| Municipal |
Africa GaNa Water Treatment |
2012 |
Gana |
100 |
UF+RO |
EP |
| Municipal |
Pretreatment Demineralization System |
2011 |
Iraq |
4,460 |
UF |
EP |
| Power |
UAE Shuweihat S3 IPP Water Treatment System (SWRO+MBP) |
2011 |
U.A.E |
4,680 |
SWRO+MBP |
EP/SV |