Industry Name of Project Date Capacity (m³/day) Process Work Scope
Oil&Gas/Chemistry S-Oil Residue Upgrading Complex Defining Package 2016 - EPC
Reuse Pocheon BTO Reuse Project 2016 22,000 UF + RO EPC
Private Finance Initiative Pocheon BTO Reuse Project 2016 22,000 UF + RO EPC
Electronics Samsung Electronics D-City Waterworks Revamping 2016 11,000 UF EP/SV
Electronics Samsung Electronics K1 Fab Membrane Replacement 2016 50,000 UF EP/SV
Power Poseung Biomass Power Plant Water Treatment System 2016 1,920 DMF+A/C+RO+MDG+EDI EPC
Power Poseung Biomass Power Plant Waste Water Treatment System 2016 464 Physical-Chemical Treatment EPC
Power Poseung Biomass Power Plant, CPP 2016 792 Ion Exchange (Condensate) EPC
Iron/Steel POSCO PosMc plant Cooling water system 2016 1,460 C/Tower + Heat Exchanger, Softener EP/SV
Iron/Steel POSCO #3 Finex Demi. Water system 2016 60 2B+3T+MBP EPC